MERKON PLAZA

COUNTRY
TURKEY
LOCATION
İSTANBUL
CONSTRUCTION AREA
10.000 m2
CLIENT
OKAN Holding
COMPLETION
2006
SERVICES
    • Emergency Generator Back Up System
    • UPS System (Uninterruptible Power Supply) 
    • IT Systems
    • Low Voltage Power Distribution
    • Power Factor Correction
    • Grounding System
    • Internal and External Lighting System
    • Fire Alarm System
    • Very Early Smoke Detection System (VESDA)
    • Humid Detection System
    • Public and Emergency Announcement System
    • Telecommunication and Data Network System
    • Fiber Optic Cable Structure-Bone for IT System
    • Equipment as well as Buildings Vertical Distribution
    • Telemetry System for Emergency Communication
    • SMATV System
    • Security System (CCTV, Access Control etc.)
    • Audio-Visual Systems for the Conference Room
    • Electrical Site Infrastructure System
    • Testing and Commissioning
  • Test and commissioning starts when the project phase finishes, it is the last step before the project gets fully operational. In this step, systems in facility are being subjected to some functional and performance tests. As the result, system elements should be verified to work together without a problem and ready to go functional. This process is about testing the systems, reporting the outcomes and ensure everything operates how it’s supposed to operate. Client, manufacturers, contractors are all present on site during this process. Especially systems such as generators, uninterruptible power supplies, fire detection and alarm systems, lightings and etc. are the main focus points.

    Test and commissioning controls consists of two stages.

    1. Compliance Controls with the Project

    • Determination of presence of the products stated in the projects
    • Compatibility to specifications and brand list of the products used on site
       

    2. Site Controls

    • Visual inspections and connection controls (Level-3)
    • Function controls of the equipment (Level-4)
    • Function tests according the scenario (Level-5)
       

    After the test and commissioning is completed, process results are being reported. This report consists the signatures of the companies and people present at this process.

    Proen Engineering handles and manages test and commissioning phase with a great care, careful to be present and ready to step in whenever it’s necessary.