TURK TELECOM ESENYURT DATA CENTER

COUNTRY
TURKEY
LOCATION
İSTANBUL
CONSTRUCTION AREA
28.000 m2
WHITESPACE AREA
12.500 m2
TIER CLASSIFICATION
Tier 3
SUSTAINABILITY
Leed Gold
COMPLETION
2018
SERVICES
    • Medium Voltage Power Distribution
    • Substation Installation
    • Emergency Generator Back Up System
    • UPS System (Uninterruptible Power Supply)
    • Low Voltage Power Distribution
    • Power Factor Correction
    • Grounding System
    • Lightning Protection System
    • Internal and External Lighting System
    • Fire Alarm System
    • Public and Emergency Announcement System
    • Telecommunication and Data Network System
    • SMATV System
    • Security System (CCTV, Access Control etc.)
    • Building Automation System
    • Electrical System Site Infrastructure Works
    • Testing and Commissioning
    • Building General HVAC System Installation
    • Cooling System Installation-DC Part
    • DC Service Rooms Cooling System Installation
    • Office HVAC System Installation
    • Fire Protection System Installation
    • Sprinkler system
    • Gas extinguishing system
    • Building Plumbing System Installation (Sanitary systems, Domestic Water, Sewage system)
    • Concrete-Reinforced Concrete-Screed Works
    • Wall Construction Works
    • Plaster Works
    • Wall, Stairs, Interior and Exterior Floor Coverings
    • Baseboard
    • Marble Works
    • Iron, Aluminum Works
    • Plaster, Paint, Hardwood Works
    • Glass and Mirror Works, Glass Room Partioning
    • Indoor and Outdoor Epoxy Works
    • Fuel Tank Construction Works
    • Site Wide Infrastructure, Ductbank/Manhole Works
    • Landscape Works
    • Facade Cladding
    • Fire Sealing Works
    • Sound Insulation Panels
  • Test and commissioning starts when the project phase finishes, it is the last step before the project gets fully operational. In this step, systems in facility are being subjected to some functional and performance tests. As the result, system elements should be verified to work together without a problem and ready to go functional. This process is about testing the systems, reporting the outcomes and ensure everything operates how it’s supposed to operate. Client, manufacturers, contractors are all present on site during this process. Especially systems such as generators, uninterruptible power supplies, fire detection and alarm systems, lightings and etc. are the main focus points.

    Test and commissioning controls consists of two stages.

    1. Compliance Controls with the Project

    • Determination of presence of the products stated in the projects
    • Compatibility to specifications and brand list of the products used on site
       

    2. Site Controls

    • Visual inspections and connection controls (Level-3)
    • Function controls of the equipment (Level-4)
    • Function tests according the scenario (Level-5)
       

    After the test and commissioning is completed, process results are being reported. This report consists the signatures of the companies and people present at this process.

    Proen Engineering handles and manages test and commissioning phase with a great care, careful to be present and ready to step in whenever it’s necessary.